The Jamestown S’Klallam Tribe is requesting proposals from qualified contractors with experience in designing and installing Electric Vehicle charging stations. A successful Design/Build proposal will include evaluating existing facilities, field verification, and designing a six-port Level 3 Electric Vehicle (EV) charging system (DCFC). Proposals must cover all engineering, system design, equipment, materials, and labor necessary to deliver a fully functional EV charging system that meets the standards of the Washington Electric Vehicle Charging Program.
View and download the full RFP document HERE
Key dates for your calendar:
- Issue RFP: June 11, 2026
- Proposal Due: July 31, 2026
Please review the full RFP document. Phone messages regarding the RFP will not be returned during the RFP process.